How We Protect Your Mold Investment

Clear Approval Points Before Steel, Samples and Production

A mold is a capital asset. The project documents should define who owns it, what is approved at each stage, which corrections are included and what happens if the tool must be maintained or transferred.

01
NDA before quotation

Confidentiality can be agreed before you disclose protected product files.

02
DFM before steel cutting

Review geometry, parting line, ejection, critical dimensions and mold-cost drivers first.

03
Customer-owned tooling

Customer-funded molds are customer-owned under the agreed purchase terms.

04
Evidence at T1

Use physical samples and dimensional results to make the next approval decision.

Stage-Gated Tooling Process

From Confidential Design to Approved Production

  1. 01

    NDA and requirements

    Define confidentiality, annual volume, resin, cosmetic requirements, critical dimensions, tool destination and program life.

  2. 02

    DFM and tooling route

    Review manufacturability and decide whether a prototype, bridge or production tool best fits the commercial plan.

  3. 03

    Mold-design approval

    Review cavity layout, parting line, gates, ejection, slides, lifters, cooling, interfaces and service components before release.

  4. 04

    Cut-steel approval

    Confirm the approved design, steel specification and agreed documentation before irreversible machining begins.

  5. 05

    Build and progress control

    Track the tooling schedule, completed operations, open decisions and changes through regular project updates.

  6. 06

    T1 samples and dimensional report

    Run the first trial, inspect the parts and document the dimensional findings that guide corrections and approval.

  7. 07

    Correction rounds and golden sample

    Separate tool corrections from customer design changes, document decisions and approve the production reference sample.

  8. 08

    Production, maintenance or transfer

    Keep the mold history and production controls visible, or prepare the agreed records, spares and packaging for tool transfer.

Match Capital to Program Risk

Choose the Tooling Class Deliberately

These are planning categories, not blanket guarantees. Steel, life target, schedule and acceptance criteria are confirmed for the actual part and operating conditions.

Tooling RouteBest FitTypical Material DirectionPlanning LifePrimary Objective
Prototype ToolMarket and design validationAluminum or soft steelThousands of cyclesLowest practical initial investment
Bridge ToolLaunch and early salesP20 or other pre-hardened steel50,000–200,000 cyclesBalance speed, capital and production demand
Production ToolStable long-term productionH13, S136 or other application-specific steel500,000+ cycles when specified and designed accordinglyLowest sustainable unit cost over program life
Put the Risk Controls in Writing

The Quotation and Order Should Define the Mold Terms

General promises are not enough. The applicable terms must be written into the quotation, purchase order or tooling agreement for the specific project.

Ownership and identification

Customer-funded tooling ownership, mold number, ownership plate and the legal entity responsible for the order.

Payment and approval milestones

Payment points, design approval, cut-steel approval, T1 review and production release.

Corrections and design changes

Which tool corrections are included, how customer design changes are quoted and who approves added cost or schedule.

Life, maintenance and storage

Tool-life target, normal maintenance scope, storage period, normal wear and responsibility for repair or refurbishment.

Transfer and project exit

Transfer conditions, preparation and packaging, outstanding balances, transport costs and any agreed transfer service charge.

Technical deliverables

Whether mold drawings, electrode data, steel certificates, spares, setup information and trial records are included.

Evidence Package

Specify the Documents Your Program Requires

DFM reportTooling scheduleMold-steel certificateT1 dimensional reportMaterial certificateOutgoing inspection report8D report formatEngineering change requestMold history record

Not every project needs the same document set

Tell us which documents, traceability level and approval formats your purchasing and quality teams require. The applicable package can then be included in the quotation scope instead of being assumed after the mold is built.

Define Your Quality Package