We design and build injection molds from your part CAD—covering DFM review, steel selection, CNC and EDM machining, assembly, test molding and revision before production or export. Mold cost and lead time depend on part geometry, cavity count, steel grade, surface finish and hot-runner requirements.
Use our Mold Cost Calculator for a preliminary estimate—some of the key decision factors that drive price and schedule can be seen from the calculator.
| Software | UG, PRO/ENGINEER, CAD, CAXA, Moldflow |
| Steel For Mould | 45#, 50#, P20, H13, 718, 718H, 738, NAK80, S136, SKD61 or customer-designated brands |
| Required Time To Finish Mould | 16 days for expediated service; 30 days for normal case |
| Target Mould Life | more than 0.5-1 million |
| Estimated Injection Molding Production Cycle | Conventionally 6-30 seconds, try to design automatic drop to reduce manual trials and injection molding processing costs. |
| Mold Cavity | Single/double/multiple |
| Mould Surface Finish | Industrial polishing grade, electroplating, high gloss, three-dimensional ripple |
| Mould Manufacturing Process | Technical requirements determination - product review – material preparation plan design - ordering materials - 3D design - mold structure and process review - drawing release - mould frame/core/ fittings/electrode processing - process inspection - assembly - test mould - modification - production - shipping – after-sales service. |